In our #YourVoiceMatters blog, our colleagues take you behind the scenes at Doosan Lentjes.
What it's like to work with us - in the office, on the construction site or at conferences - here are insights into our everyday life, which is everything, but never boring!

  • 19.04.2024

    Our construction site teams and the unexpected sausage basket visit

    Last month, our construction site teams in Dinslaken and Wiesbaden received an unexpected and extremely tasty visit.

    Read more…
  • 10.04.2024

    New layout colleague on board

    We are delighted that our new colleague, Eugen Sakovski, has been supporting our layout team since 1 February this year. Before joining us, Mr Sakovski worked as a plant designer for more than 17 years and therefore has a lot of valuable experience.

    Read more…
  • 11.03.2024

    Dresden road trip – when a business trip feels like a “weekend trip”

    In order to be able to start work straight away on Monday morning, we set off on Sunday morning. Equipped with sandwiches, biscuits and chocolate bars, my line manager Kerstin Sebastian picked me up for our business trip to Radebeul, our location in Saxony and home to our Accounting department.

    Read more…
  • 28.02.2024

    #OneLentjes go mini golfing

    What a lovely evening out together! On Wednesday, 28 February 2024, #OneLentjes met up after work to play moonlight mini golf and do something together outside of daily business.

    Read more…
  • 12.02.2024

    The WtE industry meets in Berlin for a “class reunion” – a report by Dr. Kai Kehrmann

    The Berlin Conference on Waste Management and Energy (BKAWE), which has established itself as the who’s who of the waste-to-energy (WtE) industry, took place from January 29 to 30, 2024.

    Read more…
  • 05.01.2024

    Celebrating joint successes!

    Our project team executing the Flanders sewage sludge treatment contract in Belgium has reached an important milestone – and they are celebrating together.

    Read more…
  • 21.12.2023

    Christmas is coming at Doosan Lentjes

    On 21 December 2023, our Managing Director Dirk Stokvis invited everyone to a small Christmas drink before the last colleagues left for their well-deserved Christmas holidays.

    Read more…
  • 06.12.2023

    #OneLentjes – Stronger together through better networking

    Dear readers,

    Welcome to our blog! In this article, we would like to tell you about our #OneLentjes initiative, which aims to strengthen internal networking and improve the onboarding of new colleagues.

    Read more…
  • 16.11.2023

    Berlin calling: The capital invites the sewage sludge conference – a report by Joachim Braasch

    The days of 13 and 14 November were another “class reunion” for all those affected by sewage sludge in Berlin: the industry met for the 6th time at the annual Berlin Sewage Sludge Conference, which provides an important platform for exchanging views on current political, legal and technological developments and taking a joint look into the future.

    Read more…
  • 27.10.2023

    In focus: Mateo Goschnick, Scheduling

    My history at Doosan Lentjes began in May 21 after gaining some experience in scheduling in the plant engineering sector, building steel mills.

    Read more…
  • 16.10.2023

    Process engineering welcomes new colleague

    On 11 September, we were pleased to welcome our new colleague, Uwe Lutz, who will be supporting the process engineering department as a project engineer from now on. Uwe has 30 years of experience in the industry and will be responsible for the process engineering of the flue gas cleaning and its components downstream of the waste boiler. This includes, among other things, basic and detail engineering as well as the preparation of process and P&I flow diagrams.

    Read more…
  • 29.09.2023

    Boiler & Combustion department has a new colleague

    On 11 September, our new colleague Christian Schwerdtner joined us in the Boiler/Combustion department as a design engineer, where he works on the combustion grates of our Waste-to-Energy plants. Christian is 25 years old and comes from Ratingen, Germany.

    Read more…
  • 28.09.2023

    In focus: Dennis Schlegel, Site Manager Dinslaken waste-wood-fired project

    My history at Doosan Lentjes began in July 2021, after having worked as a site supervisor on various projects in the oil & gas and energy sectors. During this time I gained in-depth experience in site management and execution. At Doosan, I was able to start out in the erection planning for the Dinslaken wood-fired power plant project and apply my expertise accordingly.

    Read more…
  • 26.09.2023

    Wiesbaden and back

    On Tuesday, 26 September 2023, Philipp Stolzenburg from Sales and I (Marketing) went to our construction site in Wiesbaden, where a modern waste-to-energy plant is currently being built. There, the main focus was to discuss possible on-site customer visits with our colleagues and to consider which local measures we can implement to improve the visibility of our activities.

    Read more…
  • 24.08.2023

    Doosan Lentjes plays badminton together

    On Thursday 24 August, we met for the first time to play a round of badminton together after work.

    Read more…
  • 17.08.2023

    Our summer party 2023

    On 17 August 2023, the time had come again: Our summer party was coming up and the atmosphere was perfect to toast and celebrate together with cool drinks, a delicious buffet and good music.

    Read more…
  • 16.08.2023

    In focus: Swen Braciak, Senior Logistics Manager

    My story at Doosan Lentjes started end of December 2022 after working many years for a competitor in the power business, where I have gained a lot of experiences for big on- and offshore power projects.

    Read more…
  • 14.08.2023

    In focus: Dr. Kai Kehrmann, Product Manager Waste-to-Energy

    My story at Doosan Lentjes started in 2007 as my first job after graduation. Beginning as a Process Engineer, I have gained experience in many functions and departments, such as Project Manager, Engineer Research and Development (R&D) and currently as Product Manager for Waste-to-Energy.

    Read more…
  • 01.07.2023

    In focus: Frank Benker, Construction Lead Engineer & Supervisory Manager

    My story at Doosan Lentjes is still to be written, as I have only been part of the Doosan Lentjes family since January 2022.
    A nice start for this is the ongoing WtE project in Wiesbaden, which I am in charge of for the field of assembly.

    Read more…
  • 01.07.2023

    In focus: Hans Herbert Kindermann, Engineering Manager

    I became aware of Doosan Lentjes through a supplier and applied. Fortunately, a role opened up as Engineering Manager in the WtE Wiesbaden project. I have been working in this role since September 2021.

    Read more…
  • 01.07.2023

    In focus: Diana Baganz, Senior Marketing Manager

    What do I particularly like about Doosan Lentjes as an employer? Definitely all the opportunities to shape things myself and implement ideas. The supervisors and the management are always open to suggestions and give the necessary freedom.

    Read more…
  • 01.07.2023

    In focus: Linda Azmee, HR Specialist Recruiting & Employer Branding

    My history at Doosan Lentjes is not that long – just 2.5 years – but it feels much longer! That may be because I feel so incredibly comfortable and at home here. From day one, I was warmly welcomed by all my colleagues.

    Read more…
  • 01.06.2023

    #YourVoiceMatters – the story behind the story

    #YourVoiceMatters – that’s our Doosan Lentjes employer brand, sure, it’s also revealed on our careers page. But for Linda and me it is so much more than that. It’s our project, actually more our baby, because it wasn’t just some task someone had given us. But first things first.

    Read more…
  • 01.03.2023

    Commissioning in Sodegaura: Vincent Verbaere travelling in Japan

    After completing my PhD in heat and mass transfer about ten years ago, I joined Doosan Lentjes. Currently, I am working in process engineering, where I spend a lot of my time developing calculation programs.

    Some time ago, I wanted to spend more time on construction sites. For me, it was the first real experience on a distant construction site in Sodegaura (Japan), where a 70MWe CFB (circulating fluidised bed) plant is currently being commissioned.

    Read more…
  • 24.06.2022

    Excursion to the wood-fired power plant in Dinslaken

    A construction site right around the corner – if that doesn’t invite you to go on an excursion together! And so, in June 2022, almost 30 colleagues armed with personal protective equipment (PPE) set off in the direction of Dinslaken to visit the construction site of the new wood-fired power plant together.

    Read more…