Our company looks back on almost 100 years of history! A long time in which a lot has happened, and we have played a decisive role in shaping the development of our industry. Take a journey into the past with us.

2003

Largest WtE order in our history: As general contractor, we are supplying four new incineration lines for the Frankfurt waste-to-energy plant. This included both the demolition of the existing plant and the refurbishment of the adjacent thermal power plant. Continuous waste disposal operations were ensured throughout the entire plant refurbishment. You can take a walk around the plant in our virtual reference list: