Go to main contents

Projects

Find out more about our latest projects.

Gardanne

Powering solutions with challenging fuels

Doosan Lentjes successfully designed, supplied, constructed and commissioned the first CFB-based Boiler Island for the biomass-fired (anthracite and anthracite sludge) 210MWe Donbasenergo Power Plant in Starobeshevo, Ukraine, owned and operated by Donbasenergo.

The design was based on a CFB Boiler already in operation in Tisova: a 110 MWe capacity plant in the Czech Republic. The compact CFB design incorporated water cooled, integrated fluidised bed heat exchangers and seal pots. Despite the existing model, the Starobeshevo plant design was complicated by the need to support the 100MWe higher capacity as well as the challenging combustion properties of the low reactive fuel used.

Featuring our CFB boiler design, the Starobeshevo plant can now not only use local anthracite but also dried anthracite sludge (culm), which would otherwise be dumped – a positive contribution to a sustainable conservation of resources.

If you are interested in more technically detailed information please download our Starobeshevo Plant Profile

Starobeshevo Plant Profile (PDF, 1,690KB)

Click the following links to see more related topics.

Our Belief

Our Belief

The Doosan Way is our philosophy for the next 100 years of growth. It is the spirit flowing through our people.

Quality, Health, Safety & Environment

Quality, Health, Safety & Environment

Our unstinting focus on quality, outstanding safety performance, and environmental vision, demonstrates our commitment to the safety and wellbeing of our people and the communities we serve.

Global Network

Global Network

Find out how Doosan Lentjes is creating innovation and changes around the world.

Check back soon for new video contents
Download
Close