Currently, Doosan Lentjes together with its Polish consortium partner Polimex Energetyka is delivering a turnkey flue gas desulphurisation (FGD) project at a 2 x 156 MWth power plant in Szczecin, Poland. The contract comprises the retrofit of the two existing coal-fired boilers with semi-dry Circoclean® facilities along with dry ash separation plants.
By applying Best Available Techniques (BAT) we will help our customer, the Polish utility PGE GiEK Zespol Elektrowni Dolna Odra, to achieve emissions values that are significantly below the European requirements. This ensures that PGE is flexible to meet, in future, even stricter directives derived from the current review of the Best Available Techniques Reference (BREF) documents.
With us executing the retrofit during the plant operation, the customer benefits from minimised downtimes having positive effects on its facility availability.
For more technically detailed information, please download our Pomorzany plant profile.
Pomorzany plant profile (PDF, 994KB)